Bridges
Walkway Bridge
The steel deck was covered in and blassted to SA2.5 to remove the old coating.
The bridge deckway was then primed with Stirling Lloyd ZED S 94, then Stirling Lloyd Bridgemaster was applied giving a slip different and waterproofing to bridge deck in red.
Magherafelt By-Pass Bridge on the A31
In this two year contract, primer was applied to 6,800m2 of concrete culverts and bridges and then eliminator was spray applied to a DFT of 2mm.
A26 Dual Carriageway, Northern Ireland
This project involved 8,500m of culverts and bridges to be primed with Par 1 Primer and Eliminator was then applied at 2mm for water proofing.
The main contractor on this project was BAM/Mc Cann.